常用生產管理物控專用術語
1.A/M---action memo.
2.AVL---avail vendor list
3.ASSY---assemble
4.BOM---bill of material
5.BFM---buy from
6.BU---business unit
7.BIOS--- basic input/output system
8.CFM---consign from
9.CCB--- change control board
10.DOA--- dead on arrival
11.DVT--- design verification test
12.DC---document center
13.DIMM---sdram
14.ETA---estimate time of arrival
15.ETD---estimate time of deliver
16.ERP---enterprise resource plan
17.EVT--- Engineering Value Test
18.EBOM--- engineering bill of material
19.ECO---engineering change order
20.ECR---engineering change requirement
21.EDI--- electronic data interchange
22.ECN---engineer change note
23.FIFO---first in, first out
24.F/T---function test
25.JIT---just in time
26.KC---key component
27.L/T---lead time
28.MRP---material require plan
29.MPS---master production schedule
30.MDS---master demand schedule
31.MN---manufacturing notice
32.MP---mater production
33.MO---manufacturing order
34.MBOM---manufacturing bill of material
35.MFG---manufacturing
36.MPI---manufacturing process instruction
篇2:企業生產物控管理要點
企業的生產與物控管理要點
生產與物控是企業的總調度,整個企業的生產與物料運作都是圍繞著這個部門運轉的,PMC部門計劃能力、控制能力與協調能力對企業的運作有非常重要的影響。
企業要建立良好的生產與物控管理,應做到:
1.建立制定完善的生產與物控運作體系(即從銷售到出貨的整體運作程序)。
2.預測及制定鞍為臺理的短、中、長期銷售計劃。
3.對自身的生產能力負荷預先進行詳細的分析,并建立完善的資料。
4.生產前期做好完整的月銷貨計劃(生產總排程)和周生產計劃。
5.配合生產計劃做到良好的物料控制。
6.對生產進度及物料進度的及時跟進以及溝通協調。